Seismo L16R & L24R - Initial Setup Guide

Seismo L16R & L24R - Initial Setup Guide

Initial Setup

TITLE
Seismo L16R and Seismo L24R Initial Setup Guide

SECTION
00:00:02 Tools Required

CHECKLIST
- Allen key
- Scissors
- Pliers
- Flat screwdriver
- Phillips screwdriver

SECTION 
00:00:10 Uncrating the Machine

INSTRUCTION STEPS
1) Use a flat screwdriver to push the metal prongs on the top of the crate upward.
2) Use pliers to straighten the prongs upward.
3) Lift the lid upward to open the crate.
4) Push the lower prongs downward in reverse to release them.
5) Repeat the same process for the side prongs.
6) Pull the crate walls off one by one.

SECTION
00:00:48 Removing Crate Supports and Packaging

INSTRUCTION STEPS
1) Use a screwdriver to remove the screws on both sides of the crate.
2) Remove the two horizontal support bars.
3) Remove the plastic covers and set them aside for future use as dust covers.
4) Remove all boxes and loose parts surrounding the machine.

SECTION
00:01:30 Removing the Machine from the Pallet

INSTRUCTION STEPS
1) Use an Allen wrench to remove the bolts securing the machine to the pallet.
2) Prepare a minimum of four people to assist with moving the machine.
3) Carefully slide the machine off the pallet.
4) Gently set the machine down on the floor.
5) Remove all external plastic shrink wrap.

SECTION
00:02:20 Identifying Included Components

CHECKLIST
- Take-up system
- Take-up brackets
- Take-up bars
- Cooling fan for media cooling

SECTION
00:02:20 Installing Take-Up Brackets

INSTRUCTION STEPS
1) Remove shrink wrap from the take-up brackets.
2) Locate the bag containing bolts and Allen key.
3) Identify left and right brackets using the notch orientation.
4) Attach the brackets to the machine using the provided bolts.
5) Do not fully tighten the bolts at this time.

SECTION
00:02:59 Installing Cooling Fan Brackets

INSTRUCTION STEPS
1) Remove shrink wrap from the cooling fan.
2) Locate the two cooling fan brackets inside the packaging.
3) Install the brackets using the same bolts.
4) Ensure correct orientation and pull brackets fully outward before securing.

SECTION
00:03:20 Installing the Cooling Fan

INSTRUCTION STEPS
1) Remove the pre-installed bolts from the cooling fan by hand.
2) Position the cooling fan as shown in the video.
3) Reinstall the two closest bolts without fully tightening.
4) Install the remaining bolts.
5) Once positioned correctly, tighten all bolts by hand.
6) Install the power cable by turning it clockwise to tighten.

SECTION
00:04:02 Installing the Take-Up Bars and System

INSTRUCTION STEPS
1) Loosen the bolts on top of the take-up brackets using an Allen wrench.
2) Install the first take-up bar and lightly tighten bolts by hand.
3) Thread the second take-up bar through the take-up system.
4) Loosen bolts as needed to pass the bar through the holes.
5) Position the full take-up system onto the brackets.
6) Thread the bar through both brackets.
7) Connect the opposite side of the take-up system to the second bar.
8) Tighten bolts by hand to secure the bars.

SECTION
00:04:44 Installing the Take-Up Core and Final Alignment

INSTRUCTION STEPS
1) Spread out the take-up system evenly.
2) Install the take-up core into place.
3) Tighten the core bolts by hand.
4) Route the power cable on the right side as shown.
5) Center all components.
6) Fully tighten all bolts using the Allen key.

SECTION
00:05:33 Vacuum and Powder Tray Setup

INSTRUCTION STEPS
1) Locate the vacuum cleaner and accessories.
2) Plug in the vacuum to allow it to charge.
3) Identify the tray at the bottom used to catch excess powder.

SECTION
00:05:45 Internal Packaging Removal

INSTRUCTION STEPS
1) Remove remaining shrink wrap from the machine exterior.
2) Unlock all four latches.
3) Lift the heating elements.
4) Remove all internal shrink wrap and foam.
5) Lower the lid halfway and manually release the safety slot.
6) Close the lid fully and lock all latches.

SECTION
00:06:26 Final Exterior Setup

INSTRUCTION STEPS
1) Remove protective film from the take-up reel.
2) Remove protective film from the top cover.
3) Lift the front heating plate.
4) Use the support beam to hold the plate open.
5) Leave the ground wire as is, or attach it to the heating plate if static issues occur.

SECTION
00:06:55 Power Connection and Electrical Setup

INSTRUCTION STEPS
1) Plug the power cable into an outlet.
2) Verify power requirements: 220V, 5.2 kW, 24 amps.
3) If required, hardwire the machine according to local standards.

SECTION
00:07:17 Main Breaker Activation and Power-On Test

INSTRUCTION STEPS
1) Loosen the two bolts on the main breaker panel.
2) Open the breaker lid.
3) Turn the breaker on.
4) Close the lid and secure it.
5) Power on the shaker.
6) Verify that all systems power on correctly.

SECTION
00:07:40 Setup Verification

CHECKLIST
- Machine powers on successfully
- No error indicators present
- All components installed securely

Get Support
Live Tech Support on Discord banner

Need help? Join our Discord community.

Our tech support team is active on Discord — it's the fastest way to get assistance, ask questions, and connect with other DTF Station users.

👉 Join the DTF Station Discord

We're also rolling out a full Help Center ticketing system through Zoho Desk soon. We'll keep you updated as that launches.

How to Join Discord


How to Use Discord
 



    • Related Articles

    • Prestige XL3 - Initial Setup Guide

      Initial Setup 1. Initial Overview SECTION 00:00:01 Overview of Software Changes at DTF Station INSTRUCTION STEPS 1) Note that R2 Pro users and higher no longer require software activation codes. 2) Confirm receipt of the Neosta software included with ...
    • Prestige XL4 - Initial Setup Guide

      1. Initial Overview OVERVIEW This video provides an initial overview of recent changes at DTF Station and explains how to locate essential setup resources, including software, videos, and documentation. SECTION 1: IMPORTANT CHANGES AT DTF STATION 1) ...
    • Aries 124 - Initial Setup Guide

      Initial Setup 1. Initial Overview <br> TITLE DTF Station Software Dongle Overview and Quick Start Guide Access SECTION 00:00:01 Software Activation Changes and Dongle Overview INSTRUCTION STEPS 1) Note that R2 Pro users and ...
    • Prestige XL2 Pro - Initial Setup Guide

      Initial Setup 1. Initial Overview OVERVIEW This guide provides an overview of recent software changes at DTF Station and explains how to locate your Quick Start Guide, videos, and software resources. This is the first step before beginning printer ...
    • Prestige L2 & XL2 - Initial Setup Guide

      Initial Setup 1. Initial Overview SECTION 00:00:01 Preparation and Waste Ink Handling INSTRUCTION STEPS 1) Reference the maintenance chart provided with the printer to confirm required weekly procedures. 2) At the end of the production week, empty ...